Heat Treatment Workshop
Interior View

    A heat treatment process generally comprises heating, thermal insulation and cooling. During this process, our products are basically quenched in water and oil.

Water Quenching

    Heating
    First, heat our drill rods for 3 to 4 hours within the hardening furnace.

  • Thermal Insulation
    After heating is completed, these drill rods will be put into a quench tank for thermal insulation.

  • Tempering and Cooling
    The drill rod will then be heated in a tempering furnace for 6 to 8 hours at a temperature range from 500℃ to 600℃. After that, it will be cooled in a tank at a temperature range from 30℃ to 40℃.

  • Nitriding
    Nitriding is available upon request. It helps reduce the risk of scratching and extend the lifespan of our products.

  • Straightening
    The thick-walled HDD drill rod is being straightened by our hydraulic machine. We use a clamp set, a dial indicator and a hydraulic jack to perform straightening operation.

  • Microstructure Testing
    A pregrinder, a polishing machine and a cutting machine are used to test the microstructure of our product.

Oil Quenching

    A pit furnace used for heating

  • This is a fuel tank. It is used for cooling at a controlled oil temperature of 30℃ to 40℃.

Contact Us

Wuxi Geotec Geological Equipment Co., Ltd.
Add.: No.113,Jiao Shan Road,Yangjian Machinery Industrial Park,Xishan,Wuxi,Jiangsu, 214107, China
Tel.: +86-510-88552380
Fax:
+86-510-88552380
+86-510-88552788